Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the divi-booster domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kokzuatyltct/public_html/wp-includes/functions.php on line 6131
Facility Construction | Masey Mechanical Ltd

Facility Construction

We have a fundamental belief that doing it right the first time is going to be easier than having to go back and fix it.

Masey Mechanical Ltd. offers total facility pre-fabrication and construction installation service. Our expertise and experience giveĀ us the pre-fabrication and module fabrication capabilities to offer value above the others.

Facility Type

  • Green Field Construction
  • Brown Field Construction
  • Processing Plants
  • Light Industrial
  • Field Facilities
  • Tank Farms
  • Booster Stations
  • Gathering Facilities
  • Batteries
  • Well Sites

Application

  • Oil
  • Gas
  • Sweet
  • Sour
  • High Pressure
  • Low Pressure
  • Process Piping
  • Structural

WCB certified,

and insured

We are authorized in accordance with ASME B31.1, ASME B31.3, and ASME Section VIII-1 in: Power Piping (Shop and Field) construction, alteration and repair; Boiler External Piping (Shop and Field) alteration and repair; Process Piping (Shop and Field) construction, alteration and repair; and Pressure Vessels (Shop and Field) construction, alteration and repair.